The cost and cycle time implications of selected contractor and Air Force system program office management policies during the development phase of a major aircraft acquisition programs
Author(s)
Morgan, Séan (Séan Padraig), 1961-
DownloadFull printable version (15.85Mb)
Other Contributors
System Design and Management Program.
Advisor
Wesley L. Harris and James H. Hines.
Terms of use
Metadata
Show full item recordDescription
Thesis (S.M.)--Massachusetts Institute of Technology, System Design and Management Program; and (S.M.)--Massachusetts Institute of Technology, Sloan School of Management, 1999. Includes bibliographical references (leaves 111-113).
Date issued
1999Department
System Design and Management Program.; Sloan School of ManagementPublisher
Massachusetts Institute of Technology
Keywords
System Design and Management Program.