Show simple item record

dc.contributor.advisorRoy Welsch and Olivier L. de Weck.en_US
dc.contributor.authorClarke, Sarah (Sarah Kathleen)en_US
dc.contributor.otherLeaders for Global Operations Program.en_US
dc.date.accessioned2013-09-24T19:35:10Z
dc.date.available2013-09-24T19:35:10Z
dc.date.copyright2013en_US
dc.date.issued2013en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/80986
dc.descriptionThesis (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division; and, (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Global Operations Program at MIT, 2013.en_US
dc.descriptionCataloged from PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (p. 39-40).en_US
dc.description.abstractUTC Aerospace Systems has a wide variety of problem solving tools driven by their Achieving Competitive Excellence (ACE) program. One tool that is frequently used to resolve and capture customer escapes is the 8D methodology. It is an eight-step process designed to identify, correct, and eliminate recurring problems and is useful in providing a feedback mechanism between the customers and suppliers. Its goal is to establish a permanent corrective action and focuses on the origin of the problem by determining its root causes. The objective of the project is to fully understand the cost benefit of implementing the 8D methodology. The initial investigation of the 8D process uncovered that some defects recorded using the 8D tool are omitted in metrics reporting, leading to poor issue resolution and limited feedback between customers and suppliers. Because the tool requires additional steps that were not required in previous problem solving techniques at UTC Aerospace Systems, it is both more cost and time intensive. To avoid wasteful spending, it is therefore important that the tool be applied only when necessary. A study was performed to identify situations when the 8D tool is used improperly. Two situations were identified: (1) when an 8D investigation is performed unnecessarily and (2) when the 8D investigation is not performed in a situation when it should be. In the first situation, the unnecessary implementation of the 8D tool results in wasted effort within the organization. In the second situation, the missed opportunity to implement the tool has the potential to allow future occurrences of the same defect that may have otherwise been avoided. Preventing a defect from occurring in the future is often achieved by redesigning a part to eliminate a systemic issue. It is therefore important to use the 8D tool in order to identify systemic issues more quickly and thereby reduce future repair costs. The costs associated with these two situations are further quantified in the project.en_US
dc.description.statementofresponsibilityby Sarah Clarke.en_US
dc.format.extent40 p.en_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectEngineering Systems Division.en_US
dc.subjectSloan School of Management.en_US
dc.subjectLeaders for Global Operations Program.en_US
dc.titleIssue resolution at a large aerospace manufactureren_US
dc.typeThesisen_US
dc.description.degreeM.B.A.en_US
dc.description.degreeS.M.en_US
dc.contributor.departmentLeaders for Global Operations Program at MITen_US
dc.contributor.departmentMassachusetts Institute of Technology. Engineering Systems Division
dc.contributor.departmentSloan School of Management
dc.identifier.oclc857788480en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record