MIT Libraries logoDSpace@MIT

MIT
View Item 
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
  • DSpace@MIT Home
  • MIT Libraries
  • MIT Theses
  • Graduate Theses
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Building flexibility in the volatile aftermarket parts : supply chains of the defense aerospace industry

Author(s)
Myers, Kevin Michael
Thumbnail
DownloadFull printable version (5.276Mb)
Other Contributors
Leaders for Manufacturing Program.
Advisor
Stephen Graves and Deborah Nightingale.
Terms of use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582
Metadata
Show full item record
Abstract
Within the Integrated Defense Systems of The Boeing Company, aftermarket support of military aircraft serves as an increasingly large source of revenue. One of the newest contracts between Boeing and the U.S. Government created such a supply partnership at the Army Rotorcraft Repair Depot in Corpus Christi, Texas. At this depot, all Army helicopters, including Boeing's AH-64 Apache Attack helicopter and CH-47 Chinook Cargo helicopter undergo major repair and overhaul. In 2004, Boeing entered an agreement with the U.S. Government to assume responsibility of the repair depot's supply chain for aftermarket parts for Boeing rotorcraft. Over the last two years, Boeing has been creating and refining Corpus Christi's support structure to ensure that the required repair parts arrive when demanded. In establishing this new supply chain, Boeing has identified numerous inefficiencies as a result of inaccurate and highly volatile forecasts. This thesis examines the impact of volatility within the new support structure and creates flexible solutions to mitigate its negative effects on lead times, multiple sources of supply and inventory management.
 
(cont.) Efforts to increase communication flow across the supply chain are used to capitalize on economies of scale for cost reduction while safety stock recommendations are made for critical end-items. Monte Carlo simulations are employed to justify and validate the solutions. The results of the thesis reveal that a strategic selection of raw material safety stock can reduce procurement lead times by an average 61% for a subset of parts while maintaining financial responsibility. Additionally, by leveraging cost reduction techniques, an average increase of 11% in Boeing's income from sales can be achieved while eliminating inefficient administrative delays and increasing customer fulfillment rates. These two recommendations demonstrate specific solutions for mitigating the effects of demand volatility and inaccurate forecasting.
 
Description
Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Aeronautics and Astronautics; in conjunction with the Leaders for Manufacturing Program at MIT, 2007.
 
Includes bibliographical references (p. 89-90).
 
Date issued
2007
URI
http://hdl.handle.net/1721.1/39695
Department
Leaders for Manufacturing Program at MIT; Massachusetts Institute of Technology. Department of Aeronautics and Astronautics; Sloan School of Management
Publisher
Massachusetts Institute of Technology
Keywords
Sloan School of Management., Aeronautics and Astronautics., Leaders for Manufacturing Program.

Collections
  • Graduate Theses
  • Theses

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Statistics

OA StatisticsStatistics by CountryStatistics by Department
MIT Libraries
PrivacyPermissionsAccessibilityContact us
MIT
Content created by the MIT Libraries, CC BY-NC unless otherwise noted. Notify us about copyright concerns.