Show simple item record

dc.contributor.advisorLarry Lapide.en_US
dc.contributor.authorTakenaga, Eugene Ten_US
dc.contributor.otherMassachusetts Institute of Technology. Engineering Systems Division.en_US
dc.date.accessioned2006-07-13T15:19:02Z
dc.date.available2006-07-13T15:19:02Z
dc.date.copyright2005en_US
dc.date.issued2005en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/33372
dc.descriptionThesis (M. Eng. in Logistics)--Massachusetts Institute of Technology, Engineering Systems Division, 2005.en_US
dc.descriptionIncludes bibliographical references (leaf 57).en_US
dc.description.abstractTargus, a consumer products distributor of laptop cases and accessories, lacks formal processes for deciding on initial purchases of short-term life cycle products with uncertain demand. This thesis reviews the current processes for the initial purchases and determines where the Company can reduce inventory risks related to the initial purchase. The research and analysis has three aspects: interviews of eight Targus managers was used to understand current initial purchases practice, a sample of initial purchase data was selected to analyze forecast errors and life cycle management, and the newsvendor problem was applied to the data sample to determine the optimal purchase which was then compared to Targus' purchases. It was found that Targus has a tendency to under-purchase items for the initial purchase and does not establish potential profitability of products prior to introduction. This thesis recommends the Company to incorporate a newsvendor approach as a basis to benchmark its initial purchases for the initial product introduction process.en_US
dc.description.statementofresponsibilityby Eugene T. Takenaga.en_US
dc.format.extent57 leavesen_US
dc.format.extent3039114 bytes
dc.format.extent3041710 bytes
dc.format.mimetypeapplication/pdf
dc.format.mimetypeapplication/pdf
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582
dc.subjectEngineering Systems Division.en_US
dc.titleInitial purchase of short-term life cycle products with uncertain demanden_US
dc.typeThesisen_US
dc.description.degreeM.Eng.in Logisticsen_US
dc.contributor.departmentMassachusetts Institute of Technology. Engineering Systems Division
dc.identifier.oclc62522930en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record