Show simple item record

dc.contributor.advisorThemistoklis Sapsis.en_US
dc.contributor.authorWashko, J. Matthew(Jon Matthew)en_US
dc.contributor.otherMassachusetts Institute of Technology. Department of Mechanical Engineering.en_US
dc.date.accessioned2019-09-26T19:37:09Z
dc.date.available2019-09-26T19:37:09Z
dc.date.copyright2019en_US
dc.date.issued2019en_US
dc.identifier.urihttps://hdl.handle.net/1721.1/122312
dc.descriptionThesis: Nav. E., Massachusetts Institute of Technology, Department of Mechanical Engineering, 2019en_US
dc.descriptionThesis: S.M., Massachusetts Institute of Technology, Department of Mechanical Engineering, 2019en_US
dc.descriptionCataloged from PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (page 49).en_US
dc.description.abstractMaintenance of United States Navy submarines is a complex set of operations comprised of scheduling, budgeting, and executing a continuous stream of work across multiple vessels in the same maintenance facility year after year. Local personnel are involved in the details of the day to day operations and focus deeply on today and tomorrow, with little bandwidth to focus on larger, systemic issues with impacts far removed from today. The addition of fluctuating annual funding levels, a younger workforce, and the pressures to meet national defense requirements add complexity and compound the pressure to mortgage tomorrow for today by deferring work without regards to its later impact. Recently, the maintenance community has begun to invest time and resources in these larger, systemic issues. This thesis investigates the impacts of deferred maintenance actions on the timely completion of submarine maintenance periods by analyzing data from 50 refits executed over a decade at Trident Refit Facility in King's Bay, Georgia. The results of this thesis are best understood in three parts: the impact of deferred maintenance actions on submarine refit on-time completions, the development of a technical, risk-based deferment decision tool, and the possible application of deferring or canceling certain maintenance items as a way to reduce the maintenance workload across the fleet. The first part shows the quantitative analysis of the data demonstrating that deferred maintenance actions are not having any negative impacts to on-time schedule execution. The second part shows how through technical analysis and application of a probability and consequence risk framework, deferment decisions can be analyzed to ensure that only low-risk work is being deferred. And finally, an application of that same framework can be made across the fleet to lower the maintenance backlog.en_US
dc.description.statementofresponsibilityby J. Matthew Washko.en_US
dc.format.extent49 pagesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsMIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectMechanical Engineering.en_US
dc.titleRisk based decision making for the deferment of U.S. Navy submarine maintenanceen_US
dc.typeThesisen_US
dc.description.degreeNav. E.en_US
dc.description.degreeS.M.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineeringen_US
dc.identifier.oclc1119389956en_US
dc.description.collectionNav.E. Massachusetts Institute of Technology, Department of Mechanical Engineeringen_US
dc.description.collectionS.M. Massachusetts Institute of Technology, Department of Mechanical Engineeringen_US
dspace.imported2019-09-26T19:37:05Zen_US
mit.thesis.degreeEngineeren_US
mit.thesis.departmentMechEen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record